27th November 2014

The Pumping Station in front of the Coronas Playa Hotel was overwhelmed by approx 10″ or 250mm of rain during the recent deluge.  This caused severe flooding to zone D’s drainage system and resulted in blockages and drain covers lifting off.  Currently this has all been cleared up and hopefully the rain forecast for the 28.11.14  will not bring a repeat of the situation.

As previously reported, replacing old lighting cables are causing problems with cables concreted in and new runs being laid in new ducts.

Brian