11th November

We have now had two full loads of Picon delivered and spread on gardens as owners requested. 

The three Fungicide treatments of our plants and shrubs by Miguel and his team seems to be effective. The general impression is that the gardens are recovering well and looking healthy.  The recycled water is working giving plants Nitrogen and assisting growth. 

The Pool Heating was switched on at the beginning of the month as normal. 

Currently 15 people are on the Internet with 21 due to be connected. In some areas poor quality trunking cable is being replaced.  This operation was already in place as Hedley Smith has replaced several hundred meters in the last 3 or 4 years.

The Internet boxes ordered from Germany by Stefan at CSL are currently in customs on Gran Canaria. Hopefully they will arrive next week and the 21 waiting will be connected. Do not forget to send your money directly to Stefan when arranging your installation with him or the equipment will not be ordered and installed. 

The remaining trees by the new store have been removed and new shrubs will be planted.  As people ask for existing shrubs to be removed we are replanting them in the area of the Store. 

One or two trees need to be removed as they are causing major problems with the sewers and as soon as we are in possession of the permits this will be done.

Brian