17th April 2017

We have had Picon delivered and are spreading it on the Gardens that have requested Picon via Luis.

We have attached pictures of the current Path leading to the Promenade we wish to re tarmac, plus a picture of the garden where Iris fell. We are currently awaiting an estimate to install a handrail to prevent further accidents.

Brian

 

 

Area showing drop to garden where handrail is proposed
Overall view of the area needing resurfacing
Surface has broken up over the years
Showing surface deterioration

11th April 2017

A large Canarian Palm by No.63 has been removed as the Tree Surgeon realised the tree had become unstable through rot and was beyond saving.

We have constantly requested the Ayuntimiento to improve the Pathway from our Gate at the Promenade end. They have now informed us, they will not improve this pathway and should we require an improvement we will have to carry out the work ourselves! Our intention now is to Tarmac this area in the next few weeks. We already have installed a new flood light to assist walkers at night time.

Brian