26th January 2014

Another section of street lights have had the old cable removed and new installed.  This area completes the work for now.  There will have to be an amount included in 2014 to carry on with this essential work.

Work is continuing on Manhole covers to footpaths to improve the relative areas.

The Heat Pumps have now been repaired and are working normally.

Two new Sodium Lights have been fitted to the Reception Roof area to improve the Road Lighting in that area.

Brian

 

20th January 2014

We have installed 2 new amplifier houses.  One on the Ts and Vs and one adjacent to No.12.  This will improve TV reception.

As we have previously mentioned the insulation cover on the street lights is breaking down and the earth spikes are corroded owing to the salt in the soil.  We have decided to install new street light cables and spikes in the areas we have not already covered.  Although Industria have not replied to our request for information we are working to the latest regulations.  This will alleviate the problems with the lights that some areas are currently experiencing.

The Heat Pump while the initial fault was Electrical and dealt with, a minor leak has also been found in the Gas.  This is currently being dealt with.  The Pump is under five years old so is still under warranty.

The annual pruning of the Palm Trees is underway and will continue for several weeks.

Brian

 

16th January 2014

 

Both pool Heat Pumps  experienced problems last week.  The Pool at the Bar had a gas leak.  This has been repaired at a cost of 256,80 euro.  This includes labour refrigerant and Gas.

The other Heat Pump is an electrical fault.  The display unit face had a been taken off by persons unknown and condensation had affected the computerized board.  This is currently being dealt with.

The center road wall repairs have been completed on one side by Todao and should result in a lot less maintenance in the future.