20th May 2016

The installation of new water mains and new connection to all T’s and V’s is now complete.

We have changed our electrical supplier to achieve superior tariffs for Pools and street lighting. This should show a considerable saving on our costs.

We are currently removing the large metal plate that acts as a cover for the Manhole between 16 and 76 and replacing with proper manhole covers. We are also changing manhole covers to pathways where needed.

We are moving a few water meters to more accessible positions for the owners to turn off the water when they leave and also make reading the meters easier.

The heating to the Pools has been turned off for the Summer months.

Brian