20th December 2015

The pruning is continuing and the area adjacent to the Coronas Hotel is almost complete.

An area to the rear of 16, 17 and 18 has had 5 meter of new pipework and metal grills fitted to alleviate the flooding issues when we have torrential rain.

I would also like to take this opportunity to wish everyone a very Merry Christmas, and a Happy new Year!

Brian

14th December 2015

50 new Sun Bed Covers have been ordered and will be fitted over the next couple of months as the fitting is time consuming.

At the end of December Analogue TV will be removed and we will be using Digital TV only. Please make sure your TV is capable of receiving Digital TV, as Hedley is already very busy setting up many TVs to Digital.

22nd November 2015

The circulation pump in Piscina 2 burnt out and has been replaced with a new pump.

There is a problem with rain water laying behind properties 16 to 18, and when excessive, liable to cause damage to the properties. Extra drainage grills are to be fitted to alleviate the situation.

Work is ongoing regards changing the TV to Digital Channels and will continue until the end of December. Many thanks to Hedley Smith, Brian Adamson and Ken Harvey for their help. We are sorry for any inconvenience while the work is continuing.

Brian

19th October 2015

The new heat pumps for the Pool adjacent to Los Amigos are currently being installed and should be complete by the end of the week.

The new gate at Piscina 2 at the top of the steps to the pump room has now been fitted as a safety issue.

We have had several requests from owners to carry out Pruning Shrubs and Trees. A programme of Pruning has been started.

Brian

28th September 2015

We have had a gate made for the top of the stairs of the middle pool pump room. Yet to be fitted.

The heat pump room, adjacent to Los Amigos is currently being extended to incorporate the new heat pumps and create extra storage facilities for our equipment.

We are continuing to replace manholes in footpaths to improve the quality of the paths.

The Island has again problems with Fungus mainly on the Hibiscus. Alexis is dealing with the treatment on our complex. Alexis will be employed for 2 weeks to assist in pruning shrubs and bushes. The excessive rain at the end of last year has encouraged a lot of growth this summer.

23rd July 2015

We are installing a Gate at the top of the Steps of Piscina 2 as we regard this as a safety issue.

We are also fitting a device between 106B and 107 to prevent vehicles parking there as several times the Kerb stones have been damaged by Vehicles.

Luis is on holiday over August. Roberta will be standing in for him.

Brian

19th July 2015

We have been installing two new runs of water main from 90 – 94 and 99a to 100b. We have been replacing the pipes to the house meters from the main pipe run

Maintenance Team Holidays :

Todao is on holiday this month
Javier has August for his month.
Miguel will take 2 weeks in September and make the remainder of his holiday taking thursdays off.

The internet as a whole has been running well with no major problems. Any issues we do have are mainly related to individual properties rather than the system.

The TV project is advancing well thanks to Hedley, Ken and Julian. We have all the equipment installed and have got eight British and German digital channels working. We have also upgraded the terrestrial TV system coming through the normal TV aerial so that there will be all the local Spanish and Canarian stations as well. We still have to carry out further testing to iron out a few minor issues, but we are almost there!

Brian