27th September 2018

Owing to the existing Modulator failing to work any longer, on Wednesday 26th new modulators were fitted. This allows us to have 8 english channels again. Your TV will need re-tuning.

Should you have a problem re-tuning your TV ring Alex or Stefan and they will re-tune your TV.

Also Monday 1.10.2018 Luis returns after his holiday so he will also help if needed.

Brian

21st September 2018

The Modulator that controls 8 channels has a software issue that has now reduced us to one channel. This Modulator has to be sent to the UK for repairs. This takes time so we are installing new modulators to reinstate the missing channels. Rather than 1 modulator that controls all the channels and when it breaks down we lose all of the channels, with individual modulators i.e. one for each channel the idea is that we only lose one channel should an individual modulator break down.

Brian

27th July 2018

We have fitted a new Head Station (Amplifier) for the TV. This allows us to equalise signal strength on every channel as they require variable signal strengths depending on individual channels.

The previous Amplifier only had the facility to send out one signal strength for all channels. This will prove to make the channels more controlable.

Brian

12th July 2018

From Monday the Basura Skip currently situated behind Los Amigos is being removed permanently.

On Monday 16th July, the Ayuntiomento insists the replacement skips i.e. 2 plastic skips will be located approx. opposite Sausolito. The Lorry for the new Skips is larger than the current Skip Lorry and will not be able to access the current Skip posistion.This will cause problems initially but we have no option as they insist 10 meters off of the main road is as far as they will go.
The intention is to empty the skips daily. I have requested a paper and cardboard recycling skip also.

It is our intention to move the Skip for garden branches and waste into the Bay where the current Basura Skip is located. This will free up a parking space.

Brian

6th July 2018

Canal Gestion, the island water company are increasing the price of water between 1.66 and 2.28%. The higher increase will affect those using more water than average. The increase should take effect within the next three months.

Brian

24th June 2018

The Ramp opposite 103T is nearing completion. Monday and Tuesday next week should see it completed. This will make access for the Team easier when wheeling Palm branches or Picon to the area. Currently the Palms which are shedding their berries over Pathways are having the berries removed.

Brian