19de mayo 2015

Julian has informed me that the website and blog require migrating to a new server, as the old server is no longer supported by the hosting company.

This will begin on Monday 25th May. He hopes that this will run smoothly, but there is the potential for some disruption of service for a period of 2-3 days after commencement.

Brian

16de mayo 2015

The new water mains has been completed between No.4 and 22.

The Palm Trees have received two treatments for the Beetle attacks with one more to go. All Chemicals used are as specified by the Cabildo. The treatment will last for 3 years before being repeated.

Brian

2nd May 2015

We are replacing the existing water mains pipe from the rear of No.22 to the path adjacent to no.4. We have experienced two slight leaks recently in the old mains pipe.

The TV and WiFi upgrades are proceeding and the project should be complete in the next few weeks.

Brian

14de abril 2015

Habrá alguna interrupción en el sistema de TV y Wi-Fi de,,en,A,,en,Esto es debido a la mejora del sistema de,,en,La interrupción será durante la jornada de trabajo,,en,La importancia de la perturbación es claro en este momento,,en,pero si tenemos más información vamos a actualizar el blog,,en,El nuevo piso de la sala de comunicaciones está siendo azulejos listos para nuestro nuevo sistema que se instalará,,en,Otro camión cargado de Picon ha sido entregado y actualmente está siendo extendido a jardines,,en,Hemos decidido iniciar el riego durante la noche, así como durante el día,,en,La razón de esto es que algunos días tenemos muy poca presión, ya que comparten el sistema con los demás,,en,Por la noche nos anticipamos un flujo más constante,,en,que debe ser beneficioso para todos,,en
17.4.2015 To 25.4.2015.

This is due to the upgrading of the system.

The disruption will be during the working day. The extent of the disruption is unclear at this time, but if we get further information we will update the blog.

Brian

8de abril 2015

The new communications room floor is currently being tiled ready for our new system to be installed.

Another Lorry load of Picon has been delivered and is currently being spread on to gardens.

We have decided to start watering overnight as well as during the day. The reason for this is that some days we have very little pressure as we share the system with others. At night we anticipate a more consistent flow, which should be beneficial to all, y especialmente a la T y V de que están al final de las carreras de riego,en.

Brian

26de marzo 2015

A builder painting on the Ts and Vs, using external plastic paint, has been washing out his brushes in the Community Shower. Please make sure any “Tradesmen” you use do not use Community Property in this way.

The swimming Pool heat pump near Los Amigos has broken down again. We will ascertain the problem and repair as soon as possible.

Brian

13de marzo 2015

An update to the previous blog message

We have just visited the Barcello Hotel to check that all is ready for tomorrow, and they have now told us that we will be in the Manrique Room after all!
Sorry for any confusion

Brian

27de febrero 2015

Ahora hemos instalado sobre,,en,metro de gato,,en,Cable,,en,cable de red de la computadora,,en,Esto se ejecuta desde nuestra nueva computadora / sala de TV hasta el primer amplificador adyacente al No.81. Esto nos permitirá eliminar todo nuestro equipo de la sala de televisión actual y tenerlo todo bajo un mismo techo,,en,Cuando se realiza la mudanza, esperamos una interrupción del sistema para,,en,Una vez que se complete el movimiento, intentamos dividir a los usuarios de wifi actuales por igual entre las tres líneas adsl actuales.,,en,Actualmente las líneas no se comparten por igual,,en,AGM en Barcello,,en,La AGM de este año puede trasladarse de la habitación Manrique a la Sala Dali, sujeto a que el personal no pueda preparar la habitación Manrique a tiempo debido a una reserva el día anterior.,,en,Desde hace varias semanas,,en 200 meter of Cat 5 Cable ( computer network cable). This is running from our new computer/TV room to the first amplifier adjacent to No.81.This will enable us to remove all of our equipment from the current TV room and have it all under one roof. When the move is carried we expect some disruption to the system for 2 – 3 días

Once the move is complete we intend to divide current wifi users equally between the three current adsl lines. Presently the lines are not equally shared.

AGM at Barcello – This years AGM may be moved from the Manrique room to the Dali Room subject to the staff being unable to prepare the Manrique room in time owing to a booking the previous day.

For several weeks now, hemos intentado tener recipientes de reciclaje instalados para plástico y cartón adyacentes al Basura detrás de Los Amigos,,en,Estamos actualmente,,en,en el sistema,,en,y esperando su llegada,,en,La poda de la palmera está a punto de completarse,,en,cargas de Picon se han comprado y extendido en los Jardines con una carga más para comprar para completar nuestros requisitos actuales,,en,Ahora hemos completado la fumigación de todas las áreas de la Zona D contra cucarachas, etc.,,en,Desde hace varias semanas, Internet ha sido inconsistente,,en,Ha quedado claro al hablar con otras personas fuera de Playa Bastian que este es un problema más amplio con Telefónica.,,en. We are currently “in the system” and awaiting their arrival.

Brian

6de febrero 2015

The Palm Tree Pruning is now nearing completion.

2 loads of Picon have been bought and spread on the Gardens with one more load to buy to complete our current requirements.

We have now completed fumigation of all areas of Zone D against cockroaches etc.

For several weeks now the internet has been inconsistent. It has become clear on speaking to other people outside of Playa Bastian that this is a wider problem with Telefonica.

Brian