19th March 2013

Miguel and the team are continuing to work to level manhole covers, to prevent accidents and reduce noise at night. They are also progressing with repairs of the walls along the centre road.

The palm tree pruning should be completed by the end of this week.

Following the AGM, the gate closure at night is to start again. It is currently being repaired with replacement of the keypads and any damaged internal parts.

We are getting estimates for the upgrade of the camera system to improve our security.

Brian

25februari,,en,De huidige programma Palmen snoeien nu bijna voltooid,,en,Mangat reparaties aan wandelpaden door het onderhoudsteam zijn aan de gang,,en,Het internet installatie werkt goed met meer dan,,en,gebruikers nu met succes aangesloten,,en,Na een analyse van het hoofd gerecirculeerd water installatie het systeem goed werkt en de planten bloeien met deze water,,en,We hebben niet gemerkt geen geur noch toename van de vliegen,,en,Tadao wordt voortgezet met de reparaties aan de muur Center Road,,en,Een verdere vier Palmbomen zijn verwijderd zodra de vergunningen zijn verkregen,,en,De rechtszaak werd gewonnen met betrekking tot de schade aan de promenade ingang Key Pads door William Prince Hilton,,en,Over,,en,uur van mij,,en,leden en Luis raad van bestuur en de gemeenschap de tijd is besteed aan deze zaak in de rechtbank en in het politiebureau,,en 2013

The current programme of Palm Trees pruning is now nearing completion.

Manhole repairs to footpaths by the maintenance team are ongoing.

The Internet installation is working well with over 50 users now successfully connected.

Following a breakdown at the main recycled water plant the system is working well and the plants are flourishing using this water. We have not noticed any smell nor increase in flies.

Tadao is continuing with the repairs to the Centre Road wall.

A further four Palm Trees have been removed once the Permits were acquired.

The Court case has been won regarding the damage to promenade entrance Key Pads by William Prince Hilton. Over 40 hours of mine, board members and Luis and community time has been spent on this case in court and in the police station.

We are currently seeking estimates to install two strategically placed sleeping policemen to slow down traffic on centre road.

Jacque, Fil, the Cannata Family and Celia wish to send heartfelt thanks to the good friends and kind community members who helped during the sudden shock of Fil having a stroke. Also for the constant support and help with transport to and from hospital. Fil is now recovering back in the UK and undergoing various therapies. Please see the Community Forum for more information on his progress, we all wish him well and speedy recovery.

Brian

30th December 2012

Na een recent incident dat heeft geleid tot schade aan de toetsenborden van de promenade,,en,de politie werd gebeld en vervolgens gearresteerd,,en,Een hoorzitting heeft plaatsgevonden en een nieuwe hoorzitting zal later in januari plaatsvinden,,en,wanneer ik meer details over de uitkomst zou moeten hebben,,en,Naar aanleiding van discussies met het stadhuis,,en,een geregistreerde expert heeft het complex bezocht om te beginnen met het beoordelen van de benodigde werkzaamheden en de kosten die gemoeid zijn met het duidelijk definiëren van onze gemeenschappelijke onderdelen,,en,De beschadigde muur op de hoofdweg grenzend aan nummer,,en,wordt vervangen door trottoirbanden en het teruggewonnen vulkanisch gesteente dat wordt gebruikt om de muur aan de andere kant te repareren,,en,Het hoofdleidingwerk langs de rij,,en,is nu vervangen,,en,bovendien,,en,meters zijn verplaatst en de toevoer naar de eigenschappen is vernieuwd,,en, the Police were called and an arrest subsequently made. A court hearing has taken place and a further hearing will be held later in January 2013 when I should have more details of the outcome.

Further to discussions with the Town Hall, a registered surveyor has visited the complex to begin to assess the work necessary and costs involved in clearly defining our common parts.

The damaged wall on the main road adjacent to number 63 will be replaced with kerbstones and the recovered volcanic rock used to repair the wall on the opposite side.

The main pipework along row 80 to 85 has now been replaced, additionally 3 metres have been moved and the supply to the properties renewed.

Ik merk dat er een klein aantal ligstoelen lijkt te zijn,,en,missend,,en,en zou dankbaar zijn als eigenaren en hun gasten zouden afzien van het verplaatsen van hen uit het zwembad,,en,Gelukkig nieuwjaar voor jullie allemaal,,en,Namens SARA,,en,Diana en Albert Ridgley van 103T willen graag iedereen bedanken die hun recente Coffee Morning heeft gesteund en het geweldige bedrag van € 280 heeft opgehaald,,en,Ik wil ook van deze gelegenheid gebruik maken om iedereen een hele fijne kerst en een gelukkig nieuwjaar toe te wensen,,en,Picon is verspreid over alle tuinen van de eigenaren die erom vroegen,,en,De planten en struiken herstellen goed na de behandelingen om de schimmelziekte uit te roeien,,en,Binnenkort starten we ons jaarlijkse snoeiprogramma voor bomen,,en,TV / Internet,,en “missing” and would be grateful if owners and their guests would refrain from moving them from the pool areas, thank you.

Happy New Year to you all!

Brian

20th December

On behalf of SARA, Diana and Albert Ridgley of 103T would like to thank all those who supported their recent Coffee Morning and raising the magnificent sum of €280.

I would also like to take this opportunity to wish everyone a very Merry Christmas and a Happy New Year!

Brian

10th December

Picon has been spread on all the Gardens of those owners who requested it.

The plants and shrubs are recovering well following the treatments to eradicate the fungal disease.

We will soon be commencing our annual tree pruning programme.

TV/Internet; Installation of cables and connectors is continuing as several are now old and need replacing. This is a continuing process started approx 3 years ago. Please remember any property in Debt to the Community will not have an Internet Connection.

No instances of any robberies recorded in the Incident Book other than plant thefts from a few gardens. This was extremely upsetting for the owners when they make such an effort.

We will be replacing the damaged Sign adjacent to 4 and 5 with a metal sign.

The mens toilet by Bar Bastian Bar has been damaged and is currently closed.

The Presidents Report is due mid January and will be covering many of the issues dealt with by the Board in 2012.

The Program of Water Pipe replacement continues with the latest run being installed from 80 to 85.

Hedley Smith kindly restored all TV signals late one Friday after a power cut created by a TV box expiring recently.

Diana and Albert Ridgley of 103T are hosting a Coffee Morning to raise some funds for SARA next Thursday 13th December at 11:00am. €2 each to include coffee/tea and biscuits. There are more details on the Notice Board in Reception or enquire directly.

The AGM will be held on 16th March 2013 at the same venue time as last year.

Brian

11th November

We have now had two full loads of Picon delivered and spread on gardens as owners requested.

The three Fungicide treatments of our plants and shrubs by Miguel and his team seems to be effective. The general impression is that the gardens are recovering well and looking healthy. The recycled water is working giving plants Nitrogen and assisting growth.

The Pool Heating was switched on at the beginning of the month as normal.

Currently 15 people are on the Internet with 21 due to be connected. In some areas poor quality trunking cable is being replaced. This operation was already in place as Hedley Smith has replaced several hundred meters in the last 3 or 4 years.

The Internet boxes ordered from Germany by Stefan at CSL are currently in customs on Gran Canaria. Hopefully they will arrive next week and the 21 waiting will be connected. Do not forget to send your money directly to Stefan when arranging your installation with him or the equipment will not be ordered and installed.

The remaining trees by the new store have been removed and new shrubs will be planted. As people ask for existing shrubs to be removed we are replanting them in the area of the Store.

One or two trees need to be removed as they are causing major problems with the sewers and as soon as we are in possession of the permits this will be done.

Brian

31st October

Miguel’s team have been spraying fungicide on the plants and shrubs for the 3rd time.

The remaining overgrowing trees to the area behind Bar Bastian Car Park have been taken down and cleared away.

Picon has been delivered and is currently being spread on gardens that have requested it.

The ‘Private’ sign between Nos 4 and 5 has been taken out of the ground and destroyed by ‘vandals’.

The Shower at Bar Bastian Pool has been vandalised and a considerable amount of water lost. Thanks to Ann Wibberley, Bungalow 20, for ringing me in the UK and letting me know and I could contact Luis to have it turned off.

The number of owners requesting Internet connection is growing steadily

Brian

28th September

On Thursday when we had heavy rain the main sewer that runs from Casa Verdes down towards the beach became blocked. This sewer is on our land between the bungalows and the hotel, the blockage flooded the adjacent area. This pipe takes all the sewerage from Casa Verdes. It must also take a lot of the rainwater although it shouldn’t, but according to Luis it was like a river.

Miguel came in during his holiday again and helped free the blockage. As a consequence we are installing extra manholes to help make the next blockage easier to deal with. This is the third time Miguel has interrupted his holiday to help out.

The TV’s also went off on the same day. Some owners are suggesting that this incident is connected to the Internet. There is no connection between the two. The TV’s were down owing to an electrical failure, a completely different problem. The cable has been replaced and the TV’s are now working. The cost to the community is approx. €400.00 plus labour. Part of the reason for this cost is an extension was built over a community cable crushing the ducts.

This is yet another example of sub standard building work being carried out on Zone D and the community picking up all of the bill.

Brian

17th September

Recycled water is being used on the gardens. Watering at night appears to work better than day time.

We are still having problems with the Beach Gate. The lock has been replaced by a magnetised system. This works well and is vandal proof so now the vandals have sprayed paint over the key pad. Also one of the new signs onto the path to Bar Bastian has been sprayed.

The first tests of our internet access system were completed successfully in late August. We are now installing the operational system into about 6 homes in varied locations across Zone D to test our cables and amplifiers. As long as all goes well with those tests, I am optimistic that we shall have full availability by the end of October.

Lanzarote has been subject to a fungus on plants and shrubs and we have been particularly badly hit. We have purchased a mobile sprayer to treat all of the plants and shrubs. This work should be completed next week.

The Pool guard finished on Sunday 16.9.12 as the children are now back at school.

Brian

11th August

Hi Installation of the Internet has commenced and may be completed in the next 4 weeks.

Information will be sent to the owners early September explaining how to pay the €316 installation fee for the system. Not to be paid into the community account but directly to the Installer. Once the money is paid the equipment will be ordered.

The recycled water has been in use since 9.7.2012. A few teething problems i.e. pressure and owners having far to many Jets in their gardens taking pressure from others.

Luis is on Holiday for 3 weeks from Monday 13.8.2012 and a replacement has been employed for this period. Reception will be open 9 am to 1 pm.

Brian