The new water company Canal Gestian have visited the complex at our request to assess the water pressure to our garden supply. They agreed the pressure levels were unacceptable and we currently have vastly improved water pressure to the gardens.
UCCT no longer maintain the Municipal Parts outside of our complex. This has been taken over by the Autiamento.
The Maintenance Team are improving areas that need painting and tidying up to maintain the high standards on the Complex. Miguel has injured himself at Home impaling his arm on a screwdriver, just missing an artery and will be off work for a while.
Street Lighting is currently working perfectly and we have not started the next phase of cable replacement.
We have now turned off the heating to the Pools as normal for this time of year.
Brian
Water Pipes
One of the Current Mains Water Pipes is under the wall by Los Amigos. Currently running from the rear of No.12 through the wall and under the concrete area surrounding the Pool. We have decided to re run this mains supply through the gardens by 12 and 13 to eliminate any future problems.
Fibre Optic Network
I had a meeting today with a telefonica engineer who informed me they were replacing new cables near the Coronas with ordinary cables as Rats had eaten through the original cables. He assured me they were currently running fibre optic cables from Arrecife right through Costa Teguise i.e. Avinida del Mar and we will all have fibre optic by the end of the year???
Brian
We have changed electrical suppliers for our complex requirements i.e. 2 pools and street lights. This should save us enough to offset the 11% increase in electrics.
The Hacienda have accepted their error and have returned the monies to our Reserve Account.
After becoming aware of a water leak under a terrace on the North side of the complex, we have installed several new supplies to properties and fitted three new valves to segregate other areas in case of future problems. We are improving the water control of the complex by installing these valves. Our maintenance team carried out the work.
Total Man Hours……..Days on the work 20……….Average total pay 100 euro per day.
Four New Lights have been fitted. Two to the Basura Skip and car park behind Los Amigos. One to the Swimming Pool area and one to Path at 110T. The tallest lights are being replaced first as they are the most difficult to maintain.

Meeting Plot 222 was held on Monday 17.3.2014. Minutes of the meeting will be on the Reception Notice Board.
Brian
Myself and Board members will be at Los Amigos on Thursday 13th of March between 7.00 and 9.00 pm for an informal gathering, all owners on Zone D are welcome to come along and join in.
We look forward to seeing you there for a relaxing evening ahead of the AGM.
Brian
The Heat Pump of the pool adjacent to Los Amigos has again broken down. Initial electrical investigations have failed to diagnose the problem. We will continue to investigate until the problem is solved.
Palm Trees around the Pool area adjacent to Los Amigos have lifted the concrete to the area where people use the Sun Beds. Approx 15 x 7 meters to be removed and cleared away and replaced with Block Paving. The reason for Block Paving should the problem occur again means repairs should be easier and cheaper to carry out.
Brian
The Palm Tree pruning continuing. 2 of the trees are considered dangerous and will have to be removed.
Centre Road wall repairs complete, other smaller walls now being repaired.
At the request of owners one handrail has been fitted ref easier access to steps with 2 other rails to be fitted shortly.
Miscellaneous painting jobs being carried out to walls and other areas.
There has been rain at times and the Lights have remained on. The latest work ref cables has stabilised the system.
Very busy time now producing AGM paperwork. All English should be posted this week with Spanish and German translations to follow shortly.
Brian
Another section of street lights have had the old cable removed and new installed. This area completes the work for now. There will have to be an amount included in 2014 to carry on with this essential work.
Work is continuing on Manhole covers to footpaths to improve the relative areas.
The Heat Pumps have now been repaired and are working normally.
Two new Sodium Lights have been fitted to the Reception Roof area to improve the Road Lighting in that area.
Brian
We have installed 2 new amplifier houses. One on the Ts and Vs and one adjacent to No.12. This will improve TV reception.
As we have previously mentioned the insulation cover on the street lights is breaking down and the earth spikes are corroded owing to the salt in the soil. We have decided to install new street light cables and spikes in the areas we have not already covered. Although Industria have not replied to our request for information we are working to the latest regulations. This will alleviate the problems with the lights that some areas are currently experiencing.
The Heat Pump while the initial fault was Electrical and dealt with, a minor leak has also been found in the Gas. This is currently being dealt with. The Pump is under five years old so is still under warranty.
The annual pruning of the Palm Trees is underway and will continue for several weeks.
Brian
Both pool Heat Pumps experienced problems last week. The Pool at the Bar had a gas leak. This has been repaired at a cost of 256,80 euro. This includes labour refrigerant and Gas.
The other Heat Pump is an electrical fault. The display unit face had a been taken off by persons unknown and condensation had affected the computerized board. This is currently being dealt with.
The center road wall repairs have been completed on one side by Todao and should result in a lot less maintenance in the future.