8th April 2015

The new communications room floor is currently being tiled ready for our new system to be installed.

Another Lorry load of Picon has been delivered and is currently being spread on to gardens.

We have decided to start watering overnight as well as during the day. The reason for this is that some days we have very little pressure as we share the system with others. At night we anticipate a more consistent flow, which should be beneficial to all, and especially to the T’s and V’s which are at the end of the irrigation runs.

Brian

26th March 2015

A builder painting on the Ts and Vs, using external plastic paint, has been washing out his brushes in the Community Shower. Please make sure any “Tradesmen” you use do not use Community Property in this way.

The swimming Pool heat pump near Los Amigos has broken down again. We will ascertain the problem and repair as soon as possible.

Brian

13th March 2015

An update to the previous blog message

We have just visited the Barcello Hotel to check that all is ready for tomorrow, and they have now told us that we will be in the Manrique Room after all!
Sorry for any confusion

Brian

27februari,,en,De huidige programma Palmen snoeien nu bijna voltooid,,en,Mangat reparaties aan wandelpaden door het onderhoudsteam zijn aan de gang,,en,Het internet installatie werkt goed met meer dan,,en,gebruikers nu met succes aangesloten,,en,Na een analyse van het hoofd gerecirculeerd water installatie het systeem goed werkt en de planten bloeien met deze water,,en,We hebben niet gemerkt geen geur noch toename van de vliegen,,en,Tadao wordt voortgezet met de reparaties aan de muur Center Road,,en,Een verdere vier Palmbomen zijn verwijderd zodra de vergunningen zijn verkregen,,en,De rechtszaak werd gewonnen met betrekking tot de schade aan de promenade ingang Key Pads door William Prince Hilton,,en,Over,,en,uur van mij,,en,leden en Luis raad van bestuur en de gemeenschap de tijd is besteed aan deze zaak in de rechtbank en in het politiebureau,,en 2015

We have now installed over 200 meter of Cat 5 Cable ( computer network cable). This is running from our new computer/TV room to the first amplifier adjacent to No.81.This will enable us to remove all of our equipment from the current TV room and have it all under one roof. When the move is carried we expect some disruption to the system for 2 – 3 days

Once the move is complete we intend to divide current wifi users equally between the three current adsl lines. Presently the lines are not equally shared.

AGM at Barcello – This years AGM may be moved from the Manrique room to the Dali Room subject to the staff being unable to prepare the Manrique room in time owing to a booking the previous day.

For several weeks now, we have been attempting to have installed recycling bins for Plastic and Cardboard adjacent to the Basura behind Los Amigos. We are currently “in the system” and awaiting their arrival.

Brian

6februari,,en,De huidige programma Palmen snoeien nu bijna voltooid,,en,Mangat reparaties aan wandelpaden door het onderhoudsteam zijn aan de gang,,en,Het internet installatie werkt goed met meer dan,,en,gebruikers nu met succes aangesloten,,en,Na een analyse van het hoofd gerecirculeerd water installatie het systeem goed werkt en de planten bloeien met deze water,,en,We hebben niet gemerkt geen geur noch toename van de vliegen,,en,Tadao wordt voortgezet met de reparaties aan de muur Center Road,,en,Een verdere vier Palmbomen zijn verwijderd zodra de vergunningen zijn verkregen,,en,De rechtszaak werd gewonnen met betrekking tot de schade aan de promenade ingang Key Pads door William Prince Hilton,,en,Over,,en,uur van mij,,en,leden en Luis raad van bestuur en de gemeenschap de tijd is besteed aan deze zaak in de rechtbank en in het politiebureau,,en 2015

The Palm Tree Pruning is now nearing completion.

2 loads of Picon have been bought and spread on the Gardens with one more load to buy to complete our current requirements.

We have now completed fumigation of all areas of Zone D against cockroaches etc.

For several weeks now the internet has been inconsistent. It has become clear on speaking to other people outside of Playa Bastian that this is a wider problem with Telefonica.

Brian

29Januari,,en,De deuren van de Gardeners kamer hebben eindelijk afgelopen en zijn vervangen door een paar Aluminium deuren,,en,nieuwe lampen worden geleverd en gemonteerd rond het midden zwembad aangezien dit heeft bewezen extra verlichting nodig hebben en op elk gewenst moment werden de Pool verlichting werkte niet,,en,Picon is afgeleverd en wordt momenteel verspreid over de tuinen,,en,Alexis heeft gepland in de Palm Tree snoeien en zal zo snel mogelijk worden begonnen,,en,De schimmel / witte vlieg is momenteel onder controle, maar we zullen in geval van verdere besmetting waakzaam blijven,,en,In de komende weken zullen we doorgaan met de straat licht kabelvervanger,,en 2015

Two loads of Picon are now being used on gardens where required.

Palm Tree pruning is now progressing and is almost 1/3rd completed. The free containers we enjoyed from the Cabildo for collecting Palm Tree cuttings are no longer available and in future we will be paying for the containers privately.

Brian

13Januari,,en,De deuren van de Gardeners kamer hebben eindelijk afgelopen en zijn vervangen door een paar Aluminium deuren,,en,nieuwe lampen worden geleverd en gemonteerd rond het midden zwembad aangezien dit heeft bewezen extra verlichting nodig hebben en op elk gewenst moment werden de Pool verlichting werkte niet,,en,Picon is afgeleverd en wordt momenteel verspreid over de tuinen,,en,Alexis heeft gepland in de Palm Tree snoeien en zal zo snel mogelijk worden begonnen,,en,De schimmel / witte vlieg is momenteel onder controle, maar we zullen in geval van verdere besmetting waakzaam blijven,,en,In de komende weken zullen we doorgaan met de straat licht kabelvervanger,,en 2015

The Doors to the Gardeners room have finally expired and have been replaced with a pair of Aluminium doors.

2 new lights are being supplied and fitted around the middle pool as this has proved to need extra lighting and at any time the Pool lights were not working.

Picon has been delivered and is currently being spread on the gardens.

Alexis has planned in the Palm Tree pruning and will commence asap.

The Fungus/white fly is currently under control but we will remain vigilant in case of further infestation.

In the next few weeks we will be continuing with the street light cable replacement.

Brian

10th December 2014

The last container has been delivered to remove trees lost in the recent bad weather. By next week we should return to normal.

We are continuing to replace old street light cables with all the problems of underground ducts becoming crushed over the years.

In the next 2 weeks we will be having more Picon delivered.

I would like to thank Ken Harvey who has helped for several days ref the lights and cable problems.

Brian

 

27th November 2014

The Pumping Station in front of the Coronas Playa Hotel was overwhelmed by approx 10″ or 250mm of rain during the recent deluge. This caused severe flooding to zone D’s drainage system and resulted in blockages and drain covers lifting off. Currently this has all been cleared up and hopefully the rain forecast for the 28.11.14 will not bring a repeat of the situation.

As previously reported, replacing old lighting cables are causing problems with cables concreted in and new runs being laid in new ducts.

Brian