19th May 2015

Julian has informed me that the website and blog require migrating to a new server, as the old server is no longer supported by the hosting company.

This will begin on Monday 25th May. He hopes that this will run smoothly, but there is the potential for some disruption of service for a period of 2-3 days after commencement.

Brian

16th May 2015

The new water mains has been completed between No.4 and 22.

The Palm Trees have received two treatments for the Beetle attacks with one more to go. All Chemicals used are as specified by the Cabildo. The treatment will last for 3 years before being repeated.

Brian

2nd May 2015

We are replacing the existing water mains pipe from the rear of No.22 to the path adjacent to no.4. We have experienced two slight leaks recently in the old mains pipe.

The TV and WiFi upgrades are proceeding and the project should be complete in the next few weeks.

Brian

14th April 2015

There will be some disruption to the TV and WiFi system from
17.4.2015 To 25.4.2015.

This is due to the upgrading of the system.

The disruption will be during the working day. The extent of the disruption is unclear at this time, but if we get further information we will update the blog.

Brian

8th April 2015

The new communications room floor is currently being tiled ready for our new system to be installed.

Another Lorry load of Picon has been delivered and is currently being spread on to gardens.

We have decided to start watering overnight as well as during the day. The reason for this is that some days we have very little pressure as we share the system with others. At night we anticipate a more consistent flow, which should be beneficial to all, and especially to the T’s and V’s which are at the end of the irrigation runs.

Brian

26th March 2015

A builder painting on the Ts and Vs, using external plastic paint, has been washing out his brushes in the Community Shower. Please make sure any “Tradesmen” you use do not use Community Property in this way.

The swimming Pool heat pump near Los Amigos has broken down again. We will ascertain the problem and repair as soon as possible.

Brian

13th March 2015

An update to the previous blog message

We have just visited the Barcello Hotel to check that all is ready for tomorrow, and they have now told us that we will be in the Manrique Room after all!
Sorry for any confusion

Brian

27th February 2015

Nous avons installé plus,,en,mètre de Cat,,en,Câble,,en,câble réseau informatique,,en,Ceci est en cours d'exécution de notre nouvel ordinateur / salle de télévision au premier amplificateur adjacent à No.81.This nous permettra de supprimer tous nos équipements de la salle de télévision actuelle et ont tout sous un même toit,,en,Une fois le déplacement effectué nous nous attendons à une perturbation du système,,en,Une fois le déménagement terminé nous avons l'intention de diviser les utilisateurs actuels wifi également entre les trois lignes de courant LNPA,,en,Actuellement, les lignes ne sont pas également partagées,,en,AGM à barcello,,en,Cette année, l'AGA peuvent être déplacés de la salle Manrique à la salle Dali sous réserve du personnel incapable de préparer la salle Manrique dans le temps en raison d'une réservation la veille,,en,Depuis plusieurs semaines,,en 200 meter of Cat 5 Cable ( computer network cable). This is running from our new computer/TV room to the first amplifier adjacent to No.81.This will enable us to remove all of our equipment from the current TV room and have it all under one roof. When the move is carried we expect some disruption to the system for 2 – 3 days

Once the move is complete we intend to divide current wifi users equally between the three current adsl lines. Presently the lines are not equally shared.

AGM at Barcello – This years AGM may be moved from the Manrique room to the Dali Room subject to the staff being unable to prepare the Manrique room in time owing to a booking the previous day.

For several weeks now, nous avons essayé d'avoir installé des bacs de recyclage pour plastique et carton à côté de la Basura derrière Los Amigos,,en,Nous sommes actuellement,,en,dans le système,,en,et en attente de leur arrivée,,en,Le Palm Élagage est maintenant en voie d'achèvement,,en,les charges de Picon ont été achetés et répartis sur les jardins avec une charge plus lourde pour acheter pour compléter nos exigences actuelles,,en,Nous avons maintenant terminé la fumigation de toutes les zones de la zone D contre les cafards, etc.,,en,Depuis plusieurs semaines, l'Internet a été incohérent,,en,Il est devenu clair à parler à d'autres personnes à l'extérieur de Playa Bastian que c'est un problème plus large avec Telefonica,,en. We are currently “in the system” and awaiting their arrival.

Brian

6th February 2015

The Palm Tree Pruning is now nearing completion.

2 loads of Picon have been bought and spread on the Gardens with one more load to buy to complete our current requirements.

We have now completed fumigation of all areas of Zone D against cockroaches etc.

For several weeks now the internet has been inconsistent. It has become clear on speaking to other people outside of Playa Bastian that this is a wider problem with Telefonica.

Brian