8th April 2015

The new communications room floor is currently being tiled ready for our new system to be installed.

Another Lorry load of Picon has been delivered and is currently being spread on to gardens.

We have decided to start watering overnight as well as during the day. The reason for this is that some days we have very little pressure as we share the system with others. At night we anticipate a more consistent flow, which should be beneficial to all, and especially to the T’s and V’s which are at the end of the irrigation runs.

Brian

26th March 2015

A builder painting on the Ts and Vs, using external plastic paint, has been washing out his brushes in the Community Shower. Please make sure any “Tradesmen” you use do not use Community Property in this way.

The swimming Pool heat pump near Los Amigos has broken down again. We will ascertain the problem and repair as soon as possible.

Brian

13th March 2015

An update to the previous blog message

We have just visited the Barcello Hotel to check that all is ready for tomorrow, and they have now told us that we will be in the Manrique Room after all!
Sorry for any confusion

Brian

27th February 2015

Nous avons installé plus,,en,mètre de Cat,,en,Câble,,en,câble réseau informatique,,en,Ceci est en cours d'exécution de notre nouvel ordinateur / salle de télévision au premier amplificateur adjacent à No.81.This nous permettra de supprimer tous nos équipements de la salle de télévision actuelle et ont tout sous un même toit,,en,Une fois le déplacement effectué nous nous attendons à une perturbation du système,,en,Une fois le déménagement terminé nous avons l'intention de diviser les utilisateurs actuels wifi également entre les trois lignes de courant LNPA,,en,Actuellement, les lignes ne sont pas également partagées,,en,AGM à barcello,,en,Cette année, l'AGA peuvent être déplacés de la salle Manrique à la salle Dali sous réserve du personnel incapable de préparer la salle Manrique dans le temps en raison d'une réservation la veille,,en,Depuis plusieurs semaines,,en 200 meter of Cat 5 Cable ( computer network cable). This is running from our new computer/TV room to the first amplifier adjacent to No.81.This will enable us to remove all of our equipment from the current TV room and have it all under one roof. When the move is carried we expect some disruption to the system for 2 – 3 days

Once the move is complete we intend to divide current wifi users equally between the three current adsl lines. Presently the lines are not equally shared.

AGM at Barcello – This years AGM may be moved from the Manrique room to the Dali Room subject to the staff being unable to prepare the Manrique room in time owing to a booking the previous day.

For several weeks now, nous avons essayé d'avoir installé des bacs de recyclage pour plastique et carton à côté de la Basura derrière Los Amigos,,en,Nous sommes actuellement,,en,dans le système,,en,et en attente de leur arrivée,,en,Le Palm Élagage est maintenant en voie d'achèvement,,en,les charges de Picon ont été achetés et répartis sur les jardins avec une charge plus lourde pour acheter pour compléter nos exigences actuelles,,en,Nous avons maintenant terminé la fumigation de toutes les zones de la zone D contre les cafards, etc.,,en,Depuis plusieurs semaines, l'Internet a été incohérent,,en,Il est devenu clair à parler à d'autres personnes à l'extérieur de Playa Bastian que c'est un problème plus large avec Telefonica,,en. We are currently “in the system” and awaiting their arrival.

Brian

6th February 2015

The Palm Tree Pruning is now nearing completion.

2 loads of Picon have been bought and spread on the Gardens with one more load to buy to complete our current requirements.

We have now completed fumigation of all areas of Zone D against cockroaches etc.

For several weeks now the internet has been inconsistent. It has become clear on speaking to other people outside of Playa Bastian that this is a wider problem with Telefonica.

Brian

29th January 2015

Deux charges de Picon sont maintenant utilisés sur les jardins si nécessaire,,en,la taille Palm Tree progresse maintenant et est presque 1/3 terminé,,en,Les conteneurs gratuits que nous avons apprécié du Cabildo pour la collecte des boutures Palm arbres ne sont plus disponibles et à l'avenir nous allons payer pour les conteneurs privé,,en.

Palm Tree pruning is now progressing and is almost 1/3rd completed. The free containers we enjoyed from the Cabildo for collecting Palm Tree cuttings are no longer available and in future we will be paying for the containers privately.

Brian

13th January 2015

Les portes de la salle Gardeners ont finalement expiré et ont été remplacés par une paire de portes en aluminium,,en,nouveaux feux sont fournis et installés autour de la piscine du milieu, car cela est avéré besoin d'un éclairage supplémentaire et à tout moment les lumières de la piscine ne fonctionnaient pas,,en,Picon a été livré et est actuellement étalée sur les jardins,,en,Alexis a prévu dans la taille Palm Tree et commencera dès que possible,,en,Fungus / mouche blanche est actuellement sous contrôle, mais nous resterons vigilants en cas de nouvelle infestation,,en,Dans les prochaines semaines, nous allons continuer avec le remplacement du câble de l'éclairage public,,en.

2 new lights are being supplied and fitted around the middle pool as this has proved to need extra lighting and at any time the Pool lights were not working.

Picon has been delivered and is currently being spread on the gardens.

Alexis has planned in the Palm Tree pruning and will commence asap.

The Fungus/white fly is currently under control but we will remain vigilant in case of further infestation.

In the next few weeks we will be continuing with the street light cable replacement.

Brian

10th December 2014

The last container has been delivered to remove trees lost in the recent bad weather. By next week we should return to normal.

We are continuing to replace old street light cables with all the problems of underground ducts becoming crushed over the years.

In the next 2 weeks we will be having more Picon delivered.

I would like to thank Ken Harvey who has helped for several days ref the lights and cable problems.

Brian

 

27th November 2014

The Pumping Station in front of the Coronas Playa Hotel was overwhelmed by approx 10″ or 250mm of rain during the recent deluge. This caused severe flooding to zone D’s drainage system and resulted in blockages and drain covers lifting off. Currently this has all been cleared up and hopefully the rain forecast for the 28.11.14 will not bring a repeat of the situation.

As previously reported, replacing old lighting cables are causing problems with cables concreted in and new runs being laid in new ducts.

Brian